The Importance of Viewing Results at the Proper Time Scale


Subject:   The Importance of Viewing Results at the Proper Time Scale

In SWMM 5 when you are simulating rapidly changing flow – such as pump flows – it is important to  remember that you are only seeing the results of the simulation at your selected report time step.  Here is an example model with the same number of pump starts for all three simulations (318), the same  average time step during the simulation (10 seconds) but different report time steps.  The conception of the pump starts is totally different visually depending on the selected report time steps.  You should always compare the starts using the pump graphs and the pump summary table.    The percent utilized and the number of pump start ups tells you  the mean pump start length or in this case 153 seconds or 45.1 percent of 30 hours divided by 318 pump starts.

0picture_device_independent_bit

Picture_device_independent_bit

  1. Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 53 other followers