An important advantage of using InfoSWMM is the ability to use all of the Arc GIS layer and programming tools. For example, you can graph the model results for the flooded and surcharged time in a node using a Bar/Column plot to show the surcharge time in the node and the flooded time in the node. A flooded node is always considered to be surcharged but a surcharged node does not always flood. The surcharge level is any water surface elevation above the highest connecting crown elevation but the flooded time is a water surface elevation at or exceeded the rim elevation of the node.
![]() |
InfoSWMM and Arc GIS Layer Properties for Surcharge and Flooded Time |
via Blogger http://www.swmm5.net/2011/06/infoswmm-and-arc-gis-for-surcharge-and.html
You may also like
-
InfoSWMM Risk Assessment Manager and How to Create Flood Damage Rasters
-
How to use GIS Gateway in InfoSWMM to Create both Data and Model Results Shapefiles
-
Junction DWF in SWMM5, InfoSWMM and ICM SWMM Networks
-
InfoSWMM Designer Tutorial
-
Features of the 1D St Venant solution for SWMM5, InfoSWMM, and ICM SWMM Networks