What are the LID Control Flow Source Options in SWMM 5?

 

The SWMM 5 options for Low Impact Development (LID) controls on a Subcatchment are very flexible, exciting, possibly recursive and a completely integrated method to treat both the pervious and impervious flow.  You can send the Subcatchment runoff to either an outlet node, impervious area of the Subcatchment, the pervious area of the Subcatchment or another Subcatchment.   You can have the LID control receive a portion or all of the impervious flow OR as in the EPA SWMM 5 LID example have the LID cover the whole Subcatchment and receive both impervious and pervious flow from one or multiple upstream Subcsatchments.  For example,  Subcatchment Swale4 in Figure 1 is 100 pervious and has upstream runoff from the pervious and impervious areas of Subcatchments S1, S3 and S4 in Figure 1.  The LID can also have either an outlet node or the pervious area of the Subcatchment on which it resides.

 

via Blogger http://www.swmm5.net/2013/07/what-are-lid-control-flow-source.html

By Autodesk Technologist for ICM/SWMM

Autodesk Water Technologist for Storm Sewer and Flood | Expert in ICM InfoWorks ICM SWMM/Ruby | 18 Years at Innovyze/Autodesk | 52 Years with EPASWMM TAC for CIMM.ORG SWMM5+

Leave a Reply

Translate »

Discover more from SWMM5, ICM SWMM, ICM InfoWorks, InfoSWMM, InfoSewer

Subscribe now to keep reading and get access to the full archive.

Continue reading