Day: July 27, 2013

Conduit Lengthening in SWMM 5

Conduit Lengthening in SWMM 5
If you use the conduit lengthening option in SWMM 5  then your short conduits will be lengthened based on the CFL or explicit time step criterion.  Any conduits in which the Length Factor or the courant time step link length over
Read the rest

Dual Drainage in SWMM 5

Subject:  Dual Drainage in SWMM 5

 

The purpose of the Dual Drainage tool in InfoSWMM is to create a major or street drainage network on top of an existing pipe or what is called the minor network in  dualdrainage.  The created major network has a node (sometimes called … Read the rest

Translate »