Day: August 17, 2020

Introduction to Example One

This project modified in this tutorial illustrates how Designer calculates sewer conduit size, storage volume, and pump size to meet specified design criteria at the minimum cost.

The model schematic is shown on the next page. The model contains two wastewater treatment plants (outfall110 and outfall94), … Read the rest

Translate »