Surcharged Node and the Link Connection in SWMM 5
Subject: Surcharged Node and the Link Connection in SWMM 5
A surcharged node in SWMM 5 uses this point iteration equation (Figure 1):
dY/dt = dQ / The sum of the Connecting Link values of dQ/dH
where Y is the depth in the node, dt is the time step, … Read the rest






