Surcharged Node and the Link Connection in SWMM 5

Subject:   Surcharged Node and the Link Connection in SWMM 5

 

surcharged node in SWMM 5 uses this point iteration equation (Figure 1):

 

dY/dt = dQ / The sum of the Connecting Link values of  dQ/dH

 