Simulation Task Manager in InfoSWMM and H2OMap SWMM

Several factors can effect the processing time needed to run simulations of sewer networks including computer hardware, simulation timestep, reporting timestep, size of the network, length of simulation, sophistication of the simulation (e.g. controls, 2D) etc. Even though our products utilize the most robust solution engines possible, simulations can take … Read the rest