July 27, 2013

InfoSWMM, SWMM5

Create Watersheds Using InfoSWMM Subcatchment Manager

Subject:  Create Watersheds Using InfoSWMM Subcatchment Manager

 

 

The Subcatchment Manager of InfoSWMM will  help calculate most of the  physical parameters associated with a Watershed or Subcatchment in SWMM 5 from a Digital Elevation Data (Step 1).  The Subcatchments area created from a Flow Direction Raster (Step 2Read the rest

#INFOSWMM, InfoSWMM, RTC, SWMM5

Real Time Control (RTC) rule for the opening and closing of an orifice in SWMM 5

Here is an example Real Time Control (RTC) rule for the opening and closing of  an orifice.

 

RULE Orifice1

IF SIMULATION  CLOCKTIME >=  01:00:00

AND SIMULATION CLOCKTIME <=  2:00:00

THEN ORIFICE OR1@82309b-15009b SETTING = 1

ELSE ORIFICE OR1@82309b-15009b SETTING = 0

PRIORITY 1

; Opens up the orifice at … Read the rest

InfoSWMM, SWMM5

Conduit Lengthening in SWMM 5

Conduit Lengthening in SWMM 5
If you use the conduit lengthening option in SWMM 5  then your short conduits will be lengthened based on the CFL or explicit time step criterion.  Any conduits in which the Length Factor or the courant time step link length over
Read the rest
InfoSWMM, SWMM5

Dual Drainage in SWMM 5

Subject:  Dual Drainage in SWMM 5

 

The purpose of the Dual Drainage tool in InfoSWMM is to create a major or street drainage network on top of an existing pipe or what is called the minor network in  dualdrainage.  The created major network has a node (sometimes called … Read the rest

Translate »
Scroll to Top